Top Assy To Upper Frame Assy Installation; Deck Pulley Installation - Peco PRO 3 BAGGER DECK DRIVE Operator's Manual

Grass collection system 48” and 52” decks
Hide thumbs Also See for PRO 3 BAGGER DECK DRIVE:
Table of Contents

Advertisement

2-7 Exhaust Deflector Plate
Installation Cont...
Figure 2-7b
Outer Engine
Mount Tube
Assembly
Figure 2-7c
Hair Pin
Clip
2-8 Top Assembly To Upper Frame
Assembly Installation
Align the pivot brackets of the top assembly P#(A0551)
to the pivot point on either side of the upper frame
assembly. Place (1) fender washer P#(K0041) between
pivot point (Figure 2-8a) and fasten by using (1)
P#(K1153) 5/16"-18 x 3/4" HHCS and (1) 5/16"-18 nyloc
nut P#(K1180). Repeat steps for other side. When
fastening leave nut slightly loose so that the top can
pivot freely. Refer to Figures 2-8a and 2-8b.
Upper Frame
Assembly
Figure 2-8b.
Clevis Pin

2-9 Deck Pulley Installation

Remove the grass deflector shield from the grass
dishcarge on the mowers deck. Remove the existing
spindle cover and hardware from the deck pulley. Figure
2-9a.
Stop unit, shut off deck attachment, set parking
brake, shut off mower engine and remove spark plug
wire before installing parts to the mower.
Do not work around the mower deck, PTO deck drive
or the blower area until you are certain that the
mower blades and the blower impeller have stopped
rotating.
8
Top Assembly
Figure 2-8a
Pivot Point
Top Assembly Here
!
WARNING
Upper Frame
Assembly
(1) 5/16"-18 x 3/4" HHCS
(1) 5/16"-18 Nyloc Nut
(1) Fender Washer
Per Side

Advertisement

Table of Contents
loading

This manual is also suitable for:

3503150335031504

Table of Contents