4.7
(Optional) Installing a LAN Switch
1. Install guide rails and floating
nuts.
2. Secure the LAN switch.
3. Connect the power cable of
the LAN switch.
4. Connect any port from 1 to 24
on the LAN switch to the
WAN_1 port on the ECC800-
Pro using a network cable.
5. Insert a power module into
the power slot of the LAN
switch.
It is recommended that the
LAN switch be installed in the
35th U position of the cabinet.
You can adjust the position
based on the site requirements.
4.8
(Optional) Installing an IVS1800
1. Install hard disks.
a. Remove screws, and take off the chassis cover.
b. Remove two black screws on each side of the chassis and the silvery white one on top of the
hard disk tray, raise the hard disk tray by 45 degrees, and take out the upper and then lower
layers of hard disk tray.
c. Place the hard disks with ports
facing upwards and align the
screw holes on the hard disk
tray with the hard disks and
fasten the screws.