PHASE 2 - TRANSMITTER INSTALLATION

3. TRANSMITTER INSTALLATION
The following examples are standard mounting locations for instrumentation suitable for these main types of applications:
3.1

TRANSMITTER LOCATION

Flow measurement with clean liquids or steam
(condensable vapor)
1. Place taps to the side of the line.
2. Mount beside or below the taps.
3. Mount the drain/vent valve upward.
4. In case of steam application fill the vertical section of the
connecting lines with a compatible fluid through the
dedicated filling tees.
Orifice plate
Flow
vent valve
H
L
A
3-valve
C
A
B
manifold
C
filling tees
gate valves
H
L
C
B
- 7 -