6 Routing Cables
6.5 Installing the AC+RPR Power Module
Power off the central office (CO) RPS before connecting the RPS power cable, and power on the CO RPS after cable
•
connection.
After routing external user cables into the cabinet, reserve an extra length so as to clamp the cables to the cable side
•
terminal block on the MDF.
40