Installing Batteries (Ac Power Supply); Installation Requirements - Huawei F01T500 Quick Installation Manual

Cabinet
Table of Contents

Advertisement

8 Installing Batteries (AC Power Supply)

8.1 Installation Requirements

Before powering on the cabinet, do not connect the batteries and power module; otherwise, the batteries will discharge to
the power module, affecting the battery service life.
Record the last charging time (The last time charged at __) and required next charging time (Refresh Charging No Later
than __) marked in the package container to ensure timely charging. If the batteries are stored overtime without any
recharging, the batteries will bulge and their capacity will decrease, resulting in a shorter service life..
Unpack the packaged batteries only after they arrive at the installation site. Install batteries grouped in the package
container. Do not use together batteries of different types, specifications, capacities, and batches in a group.
Before powering on the batteries, perform the pre-installation check.
Package container
of the batteries
Install the batteries according to the field installation environment:
If the cabinet is powered on within the day when it is installed, place the batteries into the battery compartment and connect
them.
If the cabinet is not powered on within the day when it is installed, store the batteries in an appropriate environment (battery
storage environment: temperature 5°C-45°C and relative humidity ≤ 90% RH) for proper maintenance and management.
Otherwise, the batteries will have unrecoverable damages. If the cabinet is not planned to be powered on for a short period
(1-2 months), it is recommended that the batteries be stored in the warehouse for subsequent maintenance and
management.
67

Advertisement

Table of Contents
loading

Table of Contents