Huawei F01T500 Quick Installation Manual page 16

Cabinet
Table of Contents

Advertisement

4 Installing the Cabinet on a Concrete Pedestal
Construct the concrete pedestal. Decide the specific method for constructing the concrete pedestal based on the
local standards. Ensure the constructed concrete pedestal is horizontal.The horizontal deviation must be within 4 mm.
Cover the sealing material (such as silica gel and grease) onto the cable hole at the bottom of the cabinet to seal the
cable hole gap and the gaps among cables.
The cabinet base that contacts with the concrete pedestal must be sealed to prevent moisture air from entering the
cabinet.
Constructing the Concrete Pedestal
Expansion bolt hole(for
Outer installation holes)
Expansion bolt hole(for Inner
installation holes)
Installation position for the
battery cabinet
Drilling Holes
Bolt M12 x 60
Spring washer
Flat washer
Expansion tube
Nut
Cabling aperture
(Recommended radius 40 mm)
11
Concrete pedestal
Ground

Advertisement

Table of Contents
loading

Table of Contents