Step - 4 Test Run Of Bac-Hd150 - Mitsubishi Electric BAC-HD150 Instruction Book

Air-conditioner control system; bm adapter
Hide thumbs Also See for BAC-HD150:
Table of Contents

Advertisement

7.6

Step - 4 Test run of BAC-HD150

Connect BMS and perform test run of air conditioning system.
Connect the LAN1
cable to BACnet
HUB
Setting Tool
Disconnect the
LAN2 cable.
Step-4
(1) Cutting the connection of Setting Tool
Disconnect the LAN2 cable that is connected to BAC-HD150 from the Setting Tool.
®
(2) BACnet
connection
Connect the LAN1 cable that is connected to BAC-HD150 to BACnet
(3) Restarting the BAC-HD150
Restart BAC-HD150, then it becomes [Online mode].
(4) Test run items and method
Refer to "Appendix On-site adjustment sheet for BAC-HD150 (proposal)" for the test run items and method.
HUB
®
.
BACnet
LAN1
LAN2
M-NET
Outdoor unit
BAC-HD150
Outdoor unit
System controller
BMS
HUB
®
M-NET
ME remote controller
M-NET
ME remote controller
®
.
- 35 -
Indoor unit
Indoor unit
LOSSNAY
LOSSNAY

Advertisement

Table of Contents
loading

Table of Contents