Synchronizing the Power Grid Standard Code
After you set the power grid standard code of one inverter, press Synchronize to synchronize
the standard code on other inverters, as shown in
Figure 7-44 Synchronizing the power grid standard code
7.14 Querying the Running Information of an EMI
This topic describes how to query the running information of an environmental monitoring
instrument over the WeBUI.
On the Monitoring tab page, you can choose the EMI to be queried and click Running
Information to query the values of various parameters related to the running of the EMI, such
as Total Radiation, PV Module Temperature, Ambient temperature, Wind Speed, and
Wind Direction, as shown in
Issue 04 (2013-12-15)
Figure
7-45.