Connecting Cables

• Cables must be routed in through cable clips.
• Route and bind the cables along the beams and columns of the unit.
• The cabinet has no input neutral wire. You can cut the blue neutral wire and wrap it using
insulation tape.
4.1
Connecting the Power Cable and Equipotential Bonding Cable
Downflow
Upflow
A ground cable must be routed from the
equipotential bonding point of the cabinet
to the ground.
(1) Equipotential bonding point
A ground cable must be routed from the
equipotential bonding point of the cabinet
to the ground.
(1) Equipotential bonding point