Huawei NetCol8000-C070 Quick Manual page 14

Chilled water smart cooling product
Hide thumbs Also See for NetCol8000-C070:
Table of Contents

Advertisement

Customers can purchase Huawei's switch and NetEco for the monitoring system.
4.4
(Optional) Installing the Cap (Applicable to Upflow Units)
• It takes two persons to install the cap using a 2 m step ladder.
• Before installing the cap, attach the thermal insulation foam in the accessories to the top
beam of the smart cooling product, and ensure that the reserved holes in the thermal
insulation foam are aligned with the holes in the beam. Check that the cap is intact and free
from scratches, that the sheet metal is not bent, and that the screws are secure.
1. Remove the cap front panel using a
Phillips screwdriver. Place the cap on the
top of the cabinet.
3. Secure the cap front panel to the
frame, and adjust the angle of the
front panel blade.
2. Secure the left and right sides of the cap using six
M5 screws and the front and rear of the cap using
four M5 screws.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol8000-c130Netcol8000-c190

Table of Contents