46 Installation checklist
2.
High voltage connections completed
3.
MCB ready to be tested with drive
4.
MCB interposing relay settings tested
5.
Safety devices checked and in operation
Motor breaker (MB)
1.
Type of MB selected as per
2.
High voltage connections completed
3.
MB ready to be tested with bypass - drive
4.
MB interposing relay settings tested
5.
Safety devices checked and in operation
Main starting switch (MSS)
1.
Type of MSS selected as per
2.
High voltage connections completed
3.
MSS ready to be tested with bypass - drive
4.
MSS interposing relay settings tested
5.
Safety devices checked and in operation
ACS580MV Engineering Guideline for SBU
ACS580MV Engineering Guideline for SBU