16 Safety instructions
5. Measure that the installation is de-energized.
Use only instrumentation (e.g., meters, oscilloscopes, etc.) intended for high
voltage measurements.
6. Always discharge equipment and verify that it is neither electrically alive nor thermally
hot.
7. Always install temporary grounding as required by the local regulations for both input
and output of the drive.
8. Ask for a permit to work from the person in control of the electrical installation work.

Additional instructions and notes

Do not connect the drive to a voltage higher than what is on the rating plate.
The MSS cable terminals of the bypass - drive system are at a dangerous voltage
when the input power is on, regardless of whether the motor is running or not.
External wiring can supply dangerous voltages to the terminals of relay outputs.

Grounding

Always ground the bypass - drive, the motor and adjoining equipment according to the
maintenance instructions in this manual. Assure that the drive is grounded on both
sides, i.e. on supply and converter output side. This is necessary for the personnel
safety. Proper grounding also reduces electromagnetic emission and interference.
Make sure that the cross-section of the grounding conductors is sufficient. See the
ACS580MV Engineering
Guideline. Obey the local regulations.