ABB Advance Installation, Operation And Maintenance Manual

Manual ground & test devices

Advertisement

Quick Links

Instruction Manual
ABB 15 kV/ 63 kA Manual Ground & Test Device
5/15/27 kV, 25/31.5/50/63 kA
Manual Ground & Test Devices
Installation, Operations and
Maintenance Manual
Courtesy of NationalSwitchgear.com

Advertisement

Table of Contents
loading

Summary of Contents for ABB Advance

  • Page 1 Instruction Manual ABB 15 kV/ 63 kA Manual Ground & Test Device 5/15/27 kV, 25/31.5/50/63 kA Manual Ground & Test Devices Installation, Operations and Maintenance Manual Courtesy of NationalSwitchgear.com...
  • Page 2: Table Of Contents

    2.2 Receiving, Handling, and Storage 2.2.1 Receiving 2.2.2 Handling 2.2.3 Storage 3. Usage and Operation for Advance, Advance 27, SafeGear, and SafeGear HD Manual G&T Devices 3.1 Grounding 3.2 Removing Ground/Withdrawing the Device 3.3 Testing 3.3.1 AC Withstand Voltage Test 3.3.2...
  • Page 3: Important Safety Notes & Warning

    Should clarification or additional information be required, WARNING refer the matter to your nearest ABB Sales office. When communicating with ABB regarding the product covered by this IOM Manual, always reference the ABB assigned Indicates a hazardous situation that, if not Order number.
  • Page 4: Introduction & Safe Practices

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 2. Introduction & Safe Practices Scope Receiving, Handling, and Storage The purpose of this manual is to provide instructions for Ground & Test devices are subject to complete factory unpacking, storage, installation, operation production tests and inspection prior to packaging and maintenance for the Manual Ground &...
  • Page 5: Receiving

    If the G&T devices are not placed in promptly notify the nearest district office. ABB is not service for some time, it is advisable to provide adequate responsible for damage of goods after delivery to the means of environmental protection.
  • Page 6: Usage And Operation For Advance, Advance 27, Safegear, And Safegear Hd Manual G&T Devices

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 3. Usage Operation Advance, Advance 27, SafeGear, and SafeGear HD Manual G&T Devices WARNING This equipment may contain voltages at a level which may cause death or serious injury. This equipment should only be operated by qualified personnel.
  • Page 7 Maintenance Manual, document number: IB3.2.5-7C Chapter 8. d. Advance 27 Installation, Operations, and Maintenance Manual, document number: 1VAL017002-MB Section 5.10.1. Figure 3: Device installed in the switchgear breaker compartment Figure 5: The racking tool is used to move the device between the connect and disconnect positions 7.
  • Page 8: Removing Ground/Withdrawing The Device

    Two cables per phase are required for the SafeGear HD 63 kA G&T device (see Figures 8 and 9). 5/15 kV 50 kA Advance/SafeGear and 27 kV Advance G&T 3.2 Removing Ground/Withdrawing the Device devices only require one cable per phase (not shown).
  • Page 9: Testing

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 3.3 Testing Prior to each use, the following tests should be completed to assure the G&T device is in good condition. 3.3.1 AC Withstand Voltage Test 1. Remove all grounding cables 2. For each terminal complete the following test sequence: a.
  • Page 10: Usage And Operation For Reliagear Nd G&T Devices

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 4. Usage and Operation for ReliaGear ND G&T Devices WARNING This equipment may contain voltages at a level which may cause death or serious injury. This equipment should only be operated by qualified personnel.
  • Page 11 1VAL064601-MB Rev C Installation, Operations and Maintenance Manual Figure 15: Lower terminal configuration in connected position with field distributors Figure 13: Upper terminal configuration in installed disconnected position with field distributors installed 6. Close and secure the switchgear breaker compartment door. 7.
  • Page 12: Removing Ground/Withdrawing The Device

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 4.2 Removing Ground/Withdrawing the Device 1. Rack the device to the disconnected position. 2. Open the switchgear breaker compartment door, disconnect and remove the ground bar. 4.3 Testing Prior to each use, the following tests should be completed to assure the G&T device is in good condition.
  • Page 13: Changing The Position Of The Terminals

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 4.4 Changing the position of the terminals 1. Place the G&T outside of the switchgear compartment on a level work surface. 2. Remove the (6) M8X25 screws, (6) M8 nuts, and (12) M8 washers that hold the insulation board onto the supports.
  • Page 14 Labels Kit 2RGA019075A0001 Contact Factory 2RGA021904A0001 2RGA021114P0001 Field Distributing Ball (3 Pieces Required) Primary Contact Plate 2RGA021098A0001 Assembly (1200 A) Primary Contact Plate 2RGA021098A0002 Assembly (2000 A) Note: contact your local ABB sales office for pricing and availability. Courtesy of NationalSwitchgear.com...
  • Page 15: Appendix

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual Appendix 5/15 kV, 63 kA Manual G&T (SafeGear HD) Layout Drawing Note: dimensions in mm [in] Courtesy of NationalSwitchgear.com...
  • Page 16: Kv, 1200/2000 A, 25 Ka Manual G&T Layout Drawing

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 27 kV, 1200/2000 A, 25 kA Manual G&T Layout Drawing Note: dimensions in mm [in] Courtesy of NationalSwitchgear.com...
  • Page 17: 5/15 Kv, 50 Ka Manual G&T Layout Drawing

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 5/15 kV, 50 kA Manual G&T Layout Drawing Note: dimensions in mm Courtesy of NationalSwitchgear.com...
  • Page 18: 5/15 Kv, 31.5 Ka Reliagear Nd Manual G&T Layout Drawing

    1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 5/15 kV, 31.5 kA ReliaGear ND Manual G&T Layout Drawing Courtesy of NationalSwitchgear.com...
  • Page 19: End Of Life Of Product

    ABB is committed to complying with the relevant legal ABB is committed to complying with all legal and other and other requirements for environmental protection relevant requirements for environmental protection in according to the ISO 14001 standard. The duty of the accordance with the ISO 14001 standards.
  • Page 20 In no event will ABB be responsible to the user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental or consequential...
  • Page 21 1VAL064601-MB Rev C Installation, Operations and Maintenance Manual Notes Courtesy of NationalSwitchgear.com...
  • Page 22 Any reliance placed on such information is therefore strictly at your own risk. ABB reserves the Phone: +1 407 732 2000 right to discontinue any product or service at any time.

This manual is also suitable for:

Advance 27SafegearSafegear hd

Table of Contents