(5) Attach the communication unit fixing brackets (3 places) to GT15-
75IF900, then fasten them with tightening torque of 0.36 to 0.48 N•m.
(6) Mount the network unit (A9GT-QJ71LP23 or A9GT-QJ71BR13) to GT15-
75IF900.
(7) Fasten the unit fixing brackets (3 places) with tightening torque of 0.36 to
0.48N•m.
10