Download Print this page

Huawei OptiX OSN 6800 Quick Installation Manual page 43

Intelligent optical transport platform, n63b cabinet
Hide thumbs Also See for OptiX OSN 6800:

Advertisement

4 Installing and Routing Fibers to a DCM Frame
NOTE
When you connect fibers to DCMs, make sure that the DCMs and fibers are correctly connected in
the two directions based on the engineering documents specific to the site.
1
5 Installing and Routing Fibers Between Subracks
1
4
NOTE
After the fiber installation, insert fiber plugs in idle interfaces and cover idle fibers with fiber caps.
NOTE
Choose a coiling fiber spool according to the length of redundant fibers. Wind the fibers around the big spool first
and then the smaller spool. The fibers should not be coiled too tightly or too loosely. Ensure that the bending
radius of fibers is not less than 30 mm.
WARNING
Do not look or stare into optical fibers directly without eye protection.
2
2
5
40
3
3
Fiber holder
Cable clip
Fiber
Fiber extractor
Fiber
Fiber holder

Advertisement

loading