Download Print this page

Huawei OptiX OSN 6800 Quick Installation Manual page 27

Intelligent optical transport platform, n63b cabinet
Hide thumbs Also See for OptiX OSN 6800:

Advertisement

b
Underfloor Cabling Mode
CAUTION
Do not install or remove power cables while the equipment is powered on. Ensure that the power is switched
off prior to removing or installing a power cable to avoid bodily injuries.
Support
Thread power and ground cables into the cabinet through cable holes at the bottom of the cabinet. Route the
ground cable by way of the cabling area, thread it through the cable hole at the top of the cabinet, and connect it to
the ground bolt. In addition, route the power cables by way of the cabling area to the top of the cabinet.
Put the cord end terminals of the BGND cable and blue -48 V power cable on the RTN(+) and NEG(-) input
terminals respectively, with the fluted sides of the cord end terminals facing outward. Then tighten the screws.
PDU
BGND(black)
Cabling area
PDU
(with the Junction Box)
BGND cable(black)
24
Ground cable
(yellow-green)
RTN1(+)
NEG2(-)
NEG1(-)
RTN2(+)
RTN(+) NEG(-)
Adjustable wrench
Phillips screwdriver
-48 V Power
cable(blue)
-48 V Power
cable (blue)

Advertisement

loading