Download Print this page

Huawei OptiX OSN 6800 Quick Installation Manual page 38

Intelligent optical transport platform, n63b cabinet
Hide thumbs Also See for OptiX OSN 6800:

Advertisement

c
Routing Alarm and Indicator Cables
Remove the subrack cover.
Bundle alarm and indicator cables
(If there is no outside fiber winding
direction, just bundle cables in the
inside one).
7 Installing and Routing Clock Cables
NOTE
Use the clock cascading cables to connect clock and time interfaces between the master and slave subracks.
Use the clock cascading cables to connect clock interfaces between NEs and use the straight through cables to
connect time interfaces.
For the cables used to connect the OptiX OSN 6800 to other equipment, see Clock/Time Cable in the
Hardware Description.
Connect alarm and indicator cables
to the subrack interface area.
Restore the subrack
cover back to the original
position.
35
Cable tie
Diagonal pliers
Phillips screwdriver
Route alarm and indicator
cables.

Advertisement

loading