Using The Storage Pins; Mounting The Core Processor For One Pass Operation - Toro ProCore Operator's Manual

Hide thumbs Also See for ProCore:
Table of Contents

Advertisement

Workman Tow Hitch
1. On the side of the tow hitch, slide the jack onto the
jack tube (Figure 10).
1. Jack stand
2. Rotate the jack stand to align the holes and secure
with the lynch pin (Figure 10).
4

Using the Storage Pins

No Parts Required
Procedure
The storage pins (Figure 11) are to be inserted into the
front or rear holes of the core processor.
Front Hole Position
When the storage pins are inserted into the front holes,
the core processor can safely be disconnected and
removed from the tow vehicle (Figure 11).
Rear Hole Position
Insert the storage pins into the rear holes, after the core
processor is connected to the tow vehicle (Figure 11).
Important: The core processor can only be
operated when the pins are in the rear position
Figure 10
2. Jack stand tube
1. Storage pin
2. Front hole (Core processor
disconnected from tow
vehicle)
5
Mounting the Core Processor
for One Pass Operation
Parts needed for this procedure:
1
Hitch pin (included with the one pass hitch)
1
Lynch pin (included with the one pass hitch)
2
Hitch pin (included with the one pass hitch)
2
Lynch pin (included with the one pass hitch)
5
Cable tie
Procedure
The core processor must be equipped with the One Pass
Hitch Kit, Model No. 09753 before it can be mounted
to the aerator.
1. Make sure the processor brush is set for correct
height of cut.
2. Using a tie down or rope, secure the tow-arm hitch
plate to the frame hitch pivot while raising the
tow-arm for installation (Figure 12).
14
Figure 11
3. Rear hole (Core processor
connected to tow vehicle)

Advertisement

Table of Contents
loading

This manual is also suitable for:

09749

Table of Contents