Setup - Toro ProCore Operator's Manual

Hide thumbs Also See for ProCore:
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
5
6
7
8
9
10
Media and Additional Parts
Description
Belt Tensioner Tool
Allen Wrench and Torque Gauge
Operator's Manual
Engine Operator's Manual
Parts Catalog
Certificate of Conformity
Operator Training Material
Description
Electrolyte (not supplied)
Petroleum jelly (not supplied)
Jack stand
Jack stand tube
Hitch pin (included with the one pass
hitch)
Lynch pin (included with the one pass
hitch)
Hitch pin (included with the one pass
hitch)
Lynch pin (included with the one pass
hitch)
Cable tie
No parts required
Hitch pin (included with the tow hitch)
Lynch pin (included with the tow hitch)
Cable tie
No parts required
No parts required
No parts required
Qty.
A/R
A/R
1
1
1
1
2
2
5
1
1
12
Qty.
1
Use to tension belts
1
Use to adjust bearings
1
Read prior to operating the machine
1
Use for reference to engine operation
1
Use for reference to part numbers
1
CE compliance
1
View prior to operating the machine
10
Use
Charge the battery
Install the battery
Mount the jack stand
Mount the core processor to the tow
vehicle
Disconnect the core processor from the
tow vehicle
Mount the core processor to the
Workman Vehicle
Disconnect the core processor from the
Workman Vehicle
Adjust the brush height
Level the core processor
Use

Advertisement

Table of Contents
loading

This manual is also suitable for:

09749

Table of Contents