Power-up and Test
Procedure:
Follow these steps to power up the D20 and check for correct functioning of the
Powering-up
components.
the D20
Step
1
2
Software
On start-up, inspect the D20ME/ME II LED indicators on the front panel. If the code
Corruption on
file resident on the Flash memory or the configuration file downloaded to the
NVRAM is corrupted, then:
Power-up
The RUN and FAIL LEDs illuminate alternately, which means the board is
resetting continuously, OR
The FAIL LED is constantly illuminated.
There is a workaround available for these problems using WESMAINT II+.
Procedure:
Follow these steps to login to the 68K Monitor and restore the default configuration
when the FAIL LED is constantly illuminated:
Workaround
Step
1
2
3
4
5
92
, continued
Check that all field wiring, grounding wires and fuses are in place and
secure on your D20 system.
Turn the chassis-mounted Power Supply switch to ON.
Result:
The unit is powered-up.
Set up your PC to act as a WESMAINT II+ terminal. See "Procedure:
Set up Terminal", page 91.
For serial communication, connect a WESMAINT cable from the PC
running your terminal emulation software to the DB9 connector on the
front panel of the D20ME.
Open your WESMAINT II+ terminal emulation software.
Restart your D20 or D200.
Use the 68K Monitor to download a fresh code file to the Flash memory
and a fresh configuration file to the NVRAM. See "D20/D200 Software
Configuration", page 99.
994-0078-2.00-7
Action
Action
GE Energy
General
Full

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D200

Table of Contents