GE D20 Installation And Operation Manual page 100

Hide thumbs Also See for D20:
Table of Contents

Advertisement

D20/D200
Installation and Operations Guide
Power-up and Test
Procedure
Follow these steps to verify either hardware or software switch-over.
Step
1
2
3
4
Note:
If you cannot login to WESMAINT on a CCU, then the unit is powered down. A
D20MEA> or D20MEB> prompt is seen on your emulator screen.
98
, continued
Connect a WESMAINT cable to the female DB-9 WESMAINT II+ port
on the front panel of the CCU B D20ME/ME II board, which was
originally the Standby unit.
Attach the other end of the WESMAINT II+ cable to the serial
communications port of the PC or terminal.
Login to WESMAINT through the emulator you are using.
Result: The WESMAINT Main Menu is displayed.
If you can login to WESMAINT, this indicates that CCU B is the Active
CCU.
Results: Fail over has occurred.
Note:
If the previously Active A CCU powers-up after a fail over
from CCU A to CCU B, then you will see STNBY at top left
when you login to WESMAINT on CCU B. This can take up
to a minute to occur.
994-0078-2.00-7
Action
GE Energy
General
Full

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D200

Table of Contents