Getting Started: Required Steps

Installation
Follow these steps to install and set up your D20 or D200 system.
Steps
Step
1
2
3
4
5
6
7
General
Full
Unpack the system components.
Using the Familiarization section of this guide, inspect the D20/D200 for
damage.
Note:
Report any damage immediately to GE Energy. See "Product
Support and Safety" for contact details.
Install the D20/D200.
Carry out all field wiring connections and jumper settings as set out in
"Connections and Configuration":
Power
Serial and Ethernet cabling
Field input and output connections
Power-up the D20/D200 and check for normal operation. See "Power-up
and Test". Some testing requires that code and configuration files have
been downloaded to the D20/D200.
If the FLASH memory has been deleted or corrupted, then you need to
download the code and configuration files. See "D20/D200 Software
Configuration".
If you downloaded code and configuration files, then go back to step 5
and verify that the D20/D200 is now operating correctly.
994-0078-2.00-7
Installation and Operations Guide
Action
D20/D200
11