Figure 2-51 Connect Battery Connection Cable; Figure 2-52 Installation Of The Front Cover - NEC SL1100 Hardware Manual

Hide thumbs Also See for SL1100:
Table of Contents

Advertisement

SL1100
9.
Reconnect the Battery Connection Cable to the Fuse Unit.
10. Align tabs a to f to holes A to F on Battery Box. Slide the Front Cover into position and tighten the
two screws.
2-32

Figure 2-51 Connect Battery Connection Cable

Figure 2-52 Installation of the Front Cover

ISSUE 1.0
Installation

Advertisement

Table of Contents
loading

Table of Contents