Install Optional Modules, If Any; Reinstall Cover - ABB ACQ580-01 Series Quick Installation And Start-Up Manual

Frames r0 to r5
Hide thumbs Also See for ACQ580-01 Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Install optional modules, if any

See chapter Electrical installation in ACQ580-01 (0.75 to 250 kW) hardware manual
(3AXD50000035866 [English]).

Reinstall cover

See figure
H
on page 172.
1. IP21, Reinstall the box cover: Slide the cover upwards (1a) and tighten the
retaining screws (1b).
2. IP21, Reinstall the module cover: Put the tabs on the inside of the cover top in
their counterparts on the housing (2a), press the cover at the bottom (2b) and
tighten the retaining screws (2c).
3. IP55, Reinstall the front cover: Put the tabs on the inside of the cover top in their
counterparts on the housing (3a), press the cover at the bottom (3a) and tighten
the retaining screws (3b).
For start-up instructions, see chapter
EN – Quick start-up guide
105
on page 175.
R0-
R4
R5
R6-
R9
EN
DE
ES
FR
IT
RU
SV
ZH

Advertisement

Table of Contents
loading

Table of Contents