PDU8000-(0125, 0250, 0400, 0630, 0800)
DCV8-BXA001 Battery Circuit Breaker Box
User Manual
Figure 3-4 Installing an expansion bolt
The data in the figure is for reference only. The actual data depends on site requirements.
Step 4 Align the four holes on the BCB box with the secured bolts. Then move the BCB box
downwards until the holes fit into the bolts.
Figure 3-5 Installing BCB-BOX
Issue 03 (2019-05-20)
Copyright © Huawei Technologies Co., Ltd.
3 Installation
21