SETTING THE GAS/AIR RATIO
5. Setting the C0
2
5.1
~
Connect manometer to inlet pressure
point on the gas valve.
~To
adjust the C02 it will be necessary to
first operate the boiler at maximum output.
~
Press and hold down the boost button (A)
for 10 seconds until illuminated.
5.2~
Turn heating control to maximum; the boil-
er will then go to maximum output.
Note: The control will resume normal opera-
tion after 15 minutes or if the boost button is
pressed for over a second.
5.3~
Using a flat blade screwdriver set the
C02 via adjuster (B) using table below.
Note: C02 should be measured
10
minutes
after firing the appliance.
Gas type
I
co2_
setting
I
C?~
setting
max1mum
m1mmum
Greenstar 30CDi
Natural gas
I
9.6%
±0.2
1
9.0%
±0.2
LPG
I
11.5%
±0.2 1
10.5%
±0.2
Greenstar 40CDi
Natural gas
I
9.7%
±0.2
1
9.1%
±0.2
LPG
I
11.5%
±0.2
1
10.5%
±0.2
~
Check CO is less than 200 ppm.
~Measure
the inlet pressure; it should be a
minimum of 18 mbar for natural gas and
37 mbar for LPG.
5.4~
Set the heating control to minimum. This
will make the boiler go to minimum power.
5.5~
Measure the C02; it should now be at the
figure for minimum output. If not adjust (C)
on the gas valve until correct.
~
Return to maximum and re-check the
C02. If correct press and hold down the
boost button for 2 seconds; the button will
cease to be illuminated and the blue power
indicator will be permanently illuminated.
~
Remove manometer and re-seal inlet pres-
sure point on gas valve.
~
Fit new plastic sealing cover on to outlet
adjuster (B).
~
Fit white cover over valve adjuster (C) and
secure with black security tag.
~
Remove red arrow from data plate and fit
new one in correct position for gas type.
~
Re-assemble and refit boiler case.
~
Re-connect mains electrical supply and
check boiler operation as stated in the com-
missioning section.
~
Fit new label from kit over existing label on
the appliance bottom panel.
SETTING THE GAS/AIR RATIO
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER
BOSCH GREENSTAR
30CDI/40CDI Coc,ectlocal
~ORCESTER
6
720
614
556a
(2007/07)
Bosch Group