FINISHING COMMISSIONING
The boiler has been factory set, so there
should be no need to adjust combustion
settings.
REPLACE OUTER CASING:
Replace outer casing making sure that the
securing points are properly located.
~
Press the clip (A) downwards to secure
casing on top.
~
Retighten bottom two screws (B).
INSTALLING BOTTOM PANEL:
2 The bottom panel slides onto two ledges
(C) either side of the boiler frame.
~
Hold the panel up against the underside
of the boiler and slide towards the rear until
it is fully engaged.
HAN DOVER:
~
Complete the Benchmark check list.
~
Open the facia cover by gently pressing the
centre top of the cover (D).
~
Set up the controls and show the user how
to operate all the controls shown in the User
Guide.
~
Place the user guide into the tray (E) on the
inside of the facia cover.
~
If the appliance is unused and exposed to
freezing conditions; shut off all the mains
supplies and drain the system and boiler .
.,.,.-
... ------
.................
/~""
....
,,
'\
\
\
------~
\
D
E
/
/