Bosch Worcester Greenstar CDi Conventional Series Instruction Manual page 42

Wall hung rsf gas-fired condensing regular boiler for open vented and sealed central heating systems and indirect domestic hot water
Table of Contents

Advertisement

I
I
\
\
\
\
6.
\
'
'
REPLACEMENT OF PARTS
REPLACEMENT OF PARTS
6. Gas valve
~
Isolate gas supply at boiler gas cock.
~
Pull out air inlet tube (A).
6.1
~
Undo top gas connection (B) to gas valve.
6.1
~
Undo bottom gas connection (C) to gas
valve.
6.2~
Undo two securing screws (D) on the
underside of casing.
~
Pull valve up and forward out of boiler.
~
Disconnect electrical connections.
~
Replace valve with new seals and check
for gas soundness.
Note: The valve will require setting, follow pro-
cedure "Setting the gas/air ratio" in the gas
conversion section.
7. Siphon
7.1
~
Pull condensate pipe out of the adapter.
7.2
~
Remove trap from boiler.
~
Clean trap and check that the connection
to the heat exchanger is clear.
~
Fill the condensate trap with approxi-
mately 1/4 litre of water and refit in reverse
order.
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
~ORCESTER
6 720 614 556a (2007/07)
Bosch Group

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents