Unpacking Wall Frame And Ancillary Items - Bosch Worcester Greenstar CDi Conventional Series Instruction Manual

Wall hung rsf gas-fired condensing regular boiler for open vented and sealed central heating systems and indirect domestic hot water
Table of Contents

Advertisement

IMPORTANT: All the previous Pre-Installation sections must be read
and requirements met before starting boiler or flue installation.
G
E
F
~
~
N~M
~~H
~L
~~
0
~
7
0
·-...;..,-..:......--p
~A
UNPACKING WALL FRAME
AND ANCILLARY ITEMS
LIFTING AND CARRYING PRECAUTIONS:
Lift only a manageable weight, or ask for
help.
When lifting the boiler, bend the knees,
and keep the back straight and feet apart.
Do not lift and twist at the same time.
Lift and carry the boiler close to the body.
Wear protective clothing and gloves to
protect from any sharp edges.
A- Carton
B - Wall mounting plate
C - Hanging bracket
D - Hardware pack 1
E - Hardware pack 2 (gas cock)
F - Literature pack
G - Bottom panel
H - Trap
I
Syphon Outlet Connection
(22 mm Plastic Pipe)
J -
Flow pipe
K - Return pipe 1
L - Return pipe 2
M - Pipework mounting bracket
N - Gas cock support plate
0 - Braising template
P - Upper support (polystyrene)
0 - Carton cover
IMPORTANT HANDLING INSTRUCTIONS
It is advised that two people are used to
carry the carton from the van to the point of
delivery.
Once the carton has been delivered, the
top of the carton is opened. If a sharp imple-
ment is used make sure the carton is not
pierced and that the implement is used in
such a way so that it may not cause person-
al injury. All sharp objects must be covered
or the blade retracted after use and put
away in a safe place.
~
1. The upper support is now removed with
the components (bottom panel, pipework
mounting bracket, return pipe 2, gas cock
support plate, braising template, fixings,
documentation set, hanging bracket). Open
the support cover to teke the components.
~
2. The boiler wall mounting plate as well as
flow and return pipe 1 can now be pulled out.
Additional requirements for roof space installation:
The boiler should be first unpacked before
ascending ladder to loft space.
Two sets of steps should be used.
Two people should share the lifting of the
boiler up to the loft hatch, where the boiler
is entered into the loft space tilted and slid
on its back into the loft.
Once the appliance is removed from its packag-
ing check the contents against the packing list.
Before installing appliance ensure system
has been cleaned as explained on page 8.
UNPACKING WALL FRAME AND
ANCILLARY ITEMS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
~ORCESTER
6 720 614 556a (2007/07)
Bosch Group

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents