Preparation For Commissioning; Requirements For Commissioning - Siemens SINAMICS S120 Commissioning Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Preparation for commissioning

Before commissioning observe the conditions described in this chapter.
● The preconditions for commissioning must be fulfilled (in the next chapter).
● The relevant checklist must have been worked through.
● The bus components required for communication must be wired up.
● DRIVE-CLiQ wiring rules must be adhered to.
● ON-OFF responses of the drive
1.1

Requirements for commissioning

The following are necessary for commissioning a SINAMICS S drive system:
● A programming device (PG/PC)
● STARTER commissioning tool
● A communication interface, e.g. PROFIBUS, PROFINET, Ethernet, CAN bus or USS
● Completely wired-up drive line-up (see the SINAMICS S120 Manual)
The following diagram shows a configuration example with booksize and chassis
components, as well as with PROFIBUS and PROFINET communication
Commissioning Manual
Commissioning Manual, (IH1), 01/2012, 6SL3097-4AF00-0BP2
(RS232-C)
1
15

Advertisement

Table of Contents
loading

Table of Contents