Led Indications; Setting Up Pgdad Connections; Table 7-1 Pgdad Led Indications - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

2.2
2.3
7-2
The PGDAD connects to any available digital extension port. The terminal
connections made in the PGDAD and the jumper settings determine what
features are used for each circuit.
Figure 7-1 PGDAD
Channel 1
Status LED

LED Indications

Table 7-1 PGDAD LED Indications

description of each.
Table 7-1 PGDAD LED Indications
LED
Indication
LED 1
Green LED when
CH1 in use.
LED 2
Green LED when
CH2 in use.

Setting up PGDAD Connections

This sections provides instructions for setting up the PGDAD connections.
If the PGDAD is to be wall mounted, all the cable connections should
be made first.
CAUTION
For the module to ID correctly after setting the jumpers, set the circuit
type to 0 for the module port in Program 10-03-01 prior to connecting
the line cord to the PGDAD.
Channel 2
Status LED
lists the LED indications and provides a brief
Note
Flashing green LED indicates DIP Switch setting
and programming for CH1 are conflicting.
Flashing green LED indicates DIP Switch setting
and programming for CH2 are conflicting.
Installing SV9100 Optional Equipment
Issue 2.0

Advertisement

Table of Contents
loading

Table of Contents