3.4
3-22
Installing the 9.5" Gateway (CHS2UG GW) and Base (CHS2UG B)
Chassis
The CHS2UG GW and the CHS2UG B chassis have three universal blade slots
for station, trunk and optional blades.
Before proceeding with installation of chassis, ensure site preparation is
completed. The Gateway (CHS2UG GW) chassis can be:
Wall-mounted – refer to
and Base (CHS2UG B) Chassis on page
Stand-mounted – refer to
page
3-78.
The Base (CHS2UG B) chassis can be:
Wall-mounted – refer to
and Base (CHS2UG B) Chassis on page
Stand-mounted refer to
page
3-78.
From the factory, the SG, ETH and PBXG grounds are located inside the chassis
and are connected to the FG (frame ground) on the back of the chassis.
Figure 3-26 9.5" Chassis (Front View)
Power Switch
and LED
4.2 Wall Mounting the 9.5" Gateway (CHS2UG GW)
3-46.
6.2 Stand Mounting the 9.5" CHS2UG B Chassis on
4.2 Wall Mounting the 9.5" Gateway (CHS2UG GW)
3-46.
6.2 Stand Mounting the 9.5" CHS2UG B Chassis on
Issue 2.0
3 Universal Slots
(Slot 1 for CPU)
Installing the SV9100 Chassis