ABB X Series G5 Startup Manual page 24

Flow computers and remote controllers
Hide thumbs Also See for X Series G5:
Table of Contents

Advertisement

Figure 2-5: RTD probe connector
Legend: RTD Probe Connector
1 SHLD (Drain wire= Green wire)
2 OUT (White wire)
3 (+) (White wire)
4 (-) (Black wire)
5 IN (Black wire)
6 Cable gland
7 Cord sealing nut
3.
Screw the probe connector into the thermowell.
IMPORTANT NOTE: Do not wrap the RTD cable around the pipeline.
Run the RTD cable along the side of the process stream pipeline in a
straight line. Use nylon tie wraps to secure the cable to the pipeline.
4.
Install the RTD cable into the flow computer enclosure:
a.
Remove the shipping plug from the right side of the flow
computer enclosure.
b.
Remove the cable nut from the gland and insert the RTD cable
end through the access hole in the enclosure. Leave enough
cable inside the enclosure to accommodate wiring to the RTD
terminal block (J7).
c.
Replace the cable nut on the cord and screw the cable nut onto
the cable gland inside the enclosure.
d.
Tighten the cord sealing nut to the cable gland against the RTD
cable.
e.
Secure the cable outside of the gland so that the cable turns
down immediately. This will keep moisture from seeping into
the housing along the RTD cable.
2 2 | XSE RI ES G5 STA RT UP GUI DE | 21 0 60 0 1MNAA
8
Cable
9
Retaining ring
10 RTD probe
11 Spring
12 Probe connector
13 Nylon sealing ring
14 Cable nut