Wiring Requirements - ABB X Series G5 Startup Manual

Flow computers and remote controllers
Hide thumbs Also See for X Series G5:
Table of Contents

Advertisement

For solar panel use, determine where and how to install the solar panel
outdoors. For optimum charging, avoid placing the solar panel where it will
be in shadow any part of the day. More information is available in section
3.2 Install the solar panel.
power equipment. All wiring must be complete before the device is
energized. See section

Wiring requirements

All onboard screw terminal connectors support a wire gauge range of 12
AWG to 22 AWG.
Select the wire gauge compliant with the local electrical code for the type
of signal on the connection, voltage and current load, and wire length.
WARNING: Bodily injury. Area classification requirements
determine electrical wiring installation. For more
information, refer to the certification drawing indicated on
the device's name tag, and national and local codes.
This section describes the installation of the
6 Powering the device.
2 1 0 60 01M NAA | XSER IE S G5 S TART UP G UI DE | 1 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xfc g5Xrc g5

Table of Contents