Basic Hardware Installation; Required Tools And Materials - ABB X Series G5 Startup Manual

Flow computers and remote controllers
Hide thumbs Also See for X Series G5:
Table of Contents

Advertisement

2

Basic hardware installation

The XFC and XRC can be pipe-mounted, wall-mounted, or direct-mounted
to the meter run.
IMPORTANT NOTE: Do not direct mount the larger enclosures (for
XFC – 6713, 6714 and for XRC - 6790, 6890, 6895).

Required tools and materials

To perform installations and tests, the following tools and materials are
required:
Pipe mount installation:
 One (1) enclosure mounting kit (includes instructions, brackets, U-bolts
and fastening hardware)
 One (1) pipe saddle with mounting hardware (size determined by
technician)
 One (1) 2 inch x 40 inch pipe (length may be extended if mounting a
solar panel). See
 EFM plus bolts and washers
 5 valve manifold
 2 stabilizers (futbols) plus bolts and washers
Wall mount installation:
 One (1) enclosure mounting kit (includes instructions, brackets, U-bolts
and fastening hardware)
 Four (4) wall fasteners (length and girth determined by technician
based on wall thickness and materials)
 EFM plus bolts and washers
 5 valve manifold
Direct mount installation:
 One (1) enclosure mounting kit (includes instructions, brackets, U-bolts
and fastening hardware)
Install input lines and manifold:
 Stainless steel tubing (length determined by technician)
 Four (4) sets of tube fittings, including ferrule and nut pairs
 One (1) manifold (3-valve or 5-valve manifold, determined by
technician)
Leak-test manifold and tubing connections:
 Liquid leak detector
1 2 | XSE RI ES G5 STA RT UP GUI DE | 21 0 60 0 1MNAA
Figure 3-1: Solar panel
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xfc g5Xrc g5

Table of Contents