Acquisition Of Operation Data And Tracks On Pc - Siemens S120 Instructions Manual

For hi power units
Hide thumbs Also See for S120:
Table of Contents

Advertisement

The elevator's cabin will increase the speed, exceeding the rated value
When the speed exceed of 30% the rated speed, the safety valve start to trip reducing the oil flow
and stop the cabin.
If after some meters at speed higher than the nominal value, the safety valve doesn't trip,
manually stop the elevator, by pressing the command STOP, without waiting the intervention of any
other safety device.
The Parachute function, deactivate itself after each test (0H). For a new test, after the valve regulation,
re-activate the function.
For rupture valve adjusting, refer to the relative manufacturer's instruction manual.

10.6 ACQUISITION OF OPERATION DATA AND TRACKS ON PC

The STARTER software, allows you to view and save data tracks related to parameters used, which are
indicative of the operation of the lift.
If you want to acquire data on the operation of the inverter (Charts), proceed as follows:
click the button
the + sign on the side of Commissioning and finally Trace device,
Select on the top menu screen that appears, the item Measures, which contains the list of current
measurements that you can select for displaying
Select on the top menu screen, the voice Time chart and you can see the graph of the selected track
or the real-time track during acquisitions, as in the illustration.
Figure 58 - Measurements and Charts
The recording new tracks can only happen if you are ONLINE:
Click on the triangle symbol " "to start a recording;
Click on the square symbol " "to end a record. The graphic traces acquired and available can be
retrieved by clicking on Measures.
WARNING: for the acquisition of the tracks you need to configure the inputs. To quickly do this, you
can recall the curves previously acquired, or take the configuration from the initial configuration that was
provided by Omarlift with the drive, or even require the configuration file from Omarlift.
To assign a name to a track:
Select on the top menu screen, the item Measures
Click on the measure to which you want to change the name and type the new name. Normally, the
Siemens S120_EN_rev06-08062017.docx
in the top menu bar, or click on the + sign at the side of the Drive, then click on
10-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents