ABB C1300 User Manual page 43

Advanced circular chart recorder
Hide thumbs Also See for C1300:
Table of Contents

Advertisement

C1300
Advanced circular chart recorder
Select Totalizer
set to
T1 Secure Total
IM/C1300 Rev. J
Totalizer Run Source
If required, select a digital signal to start the totalizer.
Refer to Appendix A on page 77 for a description of sources.
Totalizer Log Enable Source
If required, select the frequency at which the addition of the current totalizer values to the totalizer
log is triggered:
None
– current totalizer values are not added to the totalizer log
Prior to reset – current totalizer values are added as the totalizer resets
12 hours
– current totalizer values are added every 12 hours
24 hours
– current totalizer values are added every 24 hours
Return to top of page.
Totalizer Log Start Time
Enter the time at which logging is to start.
Return to top of page.
Totalizer Secure Total
Secure Total Reset
Select YES to reset the secure total.
The secure total is reset to either 000000000 (Count Direction set to Up) or 999999999 (Count
Direction set to Down).
Return to top of page.
3 Configuration
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents