Concluding Steps - Fujitsu PRIMERGY CX400 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY CX400 M4:
Table of Contents

Advertisement

Hard disk drives (HDD), solid state drives (SSD) and 2.5-inch PCIe-SSD
Figure 68: Fastening the front bezel fixing screw
Ê Secure the front bezel with one screw from top of chassis (see circle).
7.8.8

Concluding steps

Perform the following procedures:
Ê If applicable, install the HDD/SSD modules you removed before as
described in section
"Connecting the power cord" on page 71
Ê
Ê If applicable, switch on the relevant server node as described in section
"Switching on the server node(s)" on page
CX400 M4
"Installing 2.5-inch HDD/SSD modules" on page
Upgrade and Maintenance Manual
72.
95.
125

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents