Hard disk drives (HDD), solid state drives (SSD) and 2.5-inch PCIe-SSD
7.6
Installing the HDD/SSD bridge board
Upgrade and Repair Units
(URU)
Tools:
Preliminary and concluding steps: Phillips PH2 / (+) No. 2 hexagonal
cross SW5 / PZ2
Main steps: tool-less
V
CAUTION!
Installation procedures involving this units must be performed exclusively
by Fujitsu service personnel or technicians trained by Fujitsu. Please
note that unauthorized interference with the system will void the warranty
and exempt the manufacturer from all liability.
7.6.1
Preliminary steps
Perform the following procedures:
Ê Shut down the server nodes as described in section
server node" on page
"Disconnecting the power cord" on page 41
Ê
"Removing server nodes from the server enclosure" on page 46
Ê
"Removing the hot-plug PSU" on page 84
Ê
"Extending the server enclosure out of the rack" on page
Ê
"Opening the server enclosure" on page
Ê
Ê Remove all fan modules as described in section
on page
131.
"Removing the fan modules cage" on page
Ê
"Removing the midplane kit" on page
Ê
CX400 M4
40.
Upgrade and Maintenance Manual
Hardware: 40 minutes
"Shutting down the
50.
"Removing the fan module"
104.
152.
43.
111