ABB 650 Series Engineering Manual page 90

Relion protection and control
Hide thumbs Also See for 650 Series:
Table of Contents

Advertisement

Section 6
Local HMI engineering
84
Creating a complete HMI display page
Procedure:
1.
Make a sketch how to present the single line diagram.
2.
Place the apparatus, transformer and other symbols that are needed for the single
line diagram into the raster boxes.
3.
Add connection points where needed.
4.
Link the apparatus symbols with line elements.
5.
Adjust the text symbols while writing to north, east, south or west. Use the object
property window to do it.
6.
Place measurements when needed.
7.
Edit the name, unit and number of decimals of the measurements.
8.
Select each object that has a dynamic link and do the link to the corresponding
process object, see
9.
Check to select the correct function block. Function blocks of the same type can
have different instance numbers.
10. Validate that all links are done.
11. Save the complete picture.
12. Repeat the steps for all pages when more than one is needed.
13. Write the display configuration to IED from the GDE tool.
IEC09000666 V1 EN
Figure 57:
GDE: Establish a dynamic object link
Linking process objects
To describe a process object within an IED it needs to be established in the application
configuration, configured when given with its parameters by PST and linked to be
displayed in the HMI.
Three tools are involved for the described steps:
Figure
57.
1MRK 511 284-UEN A
IEC09000666-1-en.vsd
650 series
Engineering manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 650 series

Table of Contents