Engineering Manual
well as verifying settings by secondary injection. The manual describes the process
of testing an IED in a substation which is not in service. The chapters are organized
in chronological order in which the IED should be commissioned.
The operation manual contains instructions on how to operate the IED once it has
been commissioned. The manual provides instructions for monitoring, controlling
and setting the IED. The manual also describes how to identify disturbances and
how to view calculated and measured power grid data to determine the cause of a
fault.
The service manual contains instructions on how to service and maintain the IED.
The manual also provides procedures for de-energizing, de-commissioning and
disposal of the IED.
The application manual contains application descriptions and setting guidelines
sorted per function. The manual can be used to find out when and for what purpose
a typical protection function can be used. The manual can also be used when
calculating settings.
The technical manual contains application and functionality descriptions and lists
function blocks, logic diagrams, input and output signals, setting parameters and
technical data sorted per function. The manual can be used as a technical reference
during the engineering phase, installation and commissioning phase, and during
normal service.
The communication protocol manual describes a communication protocol
supported by the IED. The manual concentrates on vendor-specific implementations.
The point list manual describes the outlook and properties of the data points
specific to the IED. The manual should be used in conjunction with the
corresponding communication protocol manual.

Document revision history

Document revision/date
-/June 2012

Related documents

650 series manuals
Communication protocol manual, DNP3
Communication protocol manual, IEC 61850–8–1
Communication protocol manual, IEC 60870-5-103
Cyber Security deployment guidelines
Point list manual, DNP3
Engineering manual
Table continues on next page
History
First release
Identity number
1MRK 511 257-UEN
1MRK 511 258-UEN
1MRK 511 259-UEN
1MRK 511 268-UEN
1MRK 511 260-UEN
1MRK 511 261-UEN
Section 1
Introduction
7

Advertisement

Table of Contents
loading

Table of Contents