Emax E1.2 Circuit-Breakers; Contents; Organization Of This Handbook; Intended Readership - ABB SACE Emax 2 Installation, Operation And Maintenance Instructions For The Installer And The User

Low voltage air circuit-breakers
Table of Contents

Advertisement

Emax E1.2 circuit-breakers

1 - Contents

Organization of this handbook This manual contains instructions on the operations to be performed on EMAX circuit-breakers E1.2
Intended readership This manual refers to two user profiles, as defined by standard IEC 60050:

Instructions

Integrated informations Further details about functionality, parameters and supporting documentation are given in the Emax2
4 | © 2017 ABB | 1SDH000999R0002 - ECN000058721 - Rev. B
throughout their life cycle, from reception to installation, and from commissioning to subsequent maintenance
during operation, with particular attention to the environment at the end of the life cycle of the product.
Reception
Installation
Figure 1
• Expert person, in the electrical area (IEV 195-04-01: person with relevant education and experience to
enable him or her to perceive risks and to avoid hazards which electricity can create).
• Instructed person, in the electrical area (IEV 195-04-02: person adequately advised or supervised by
electrically skilled persons to enable him or her to perceive risks and to avoid danger which electricity
can create).
NOTE: This manual specifically indicates what operations can be performed by people trained
in the field of electricity. All the remaining operations described in the handbook must be
performed by expert persons, in the electrical area. ABB declines all liability for damage to
persons or property caused by failure to comply with the instructions in this document.
HAZARD! RISK OF ELECTRIC SHOCK! Unplug or disconnect any power supply, to
avoid any potential risk of shock during assembly, installation, maintenance or
removal of the circuit-breaker from the service.
WARNING! Some operations must be performed when the circuit-breaker is energized.
In this case it is necessary to comply with all safety regulations.
WARNING! after the circuit-breaker has been installed, put it into service by complying
with the instructions given from page 90.
engineering manual.
1SDH001330R0002
Commissioning
Maintenance
available on the web site ABB library.
ABB | SACE Emax 2
Disposal
Emax E1.2 circuit-breakers | 1 - Contents

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emax e1.2-aEmax e1.2

Table of Contents