Positioning Anchor Plates - ABB SACE Emax 2 Installation, Operation And Maintenance Instructions For The Installer And The User

Low voltage air circuit-breakers
Table of Contents

Advertisement

Positioning anchor plates The diagram below indicates the distance for positioning the first anchor plate according to the circuit-
30 | © 2017 ABB | 1SDH000999R0002 - ECN000058721 - Rev. B
breaker type and the peak current:
500/
19.69
E1.2
450/
17.72
400/
15.75
350/
13.78
300/
11.81
250/
9.84
200/
7.87
150/
5.91
100/
3.94
40
60
80
Figure 65
(1): distance of the first anchor plate from the circuit-breaker terminals
(2): peak current
100
120
140
160
ABB | SACE Emax 2
L
L
L
L
Emax E1.2 circuit-breakers | 6 - Installation
L
L

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emax e1.2-aEmax e1.2

Table of Contents