Disassembly operations To disassemble the parts of the circuit-breaker:
102 | © 2017 ABB | 1SDH000999R0002 - ECN000058721 - Rev. B
1.
Remove the front cover (A) by removing the mounting screws (B and C).
2.
With a four-pole circuit-breaker, remove the lateral shield (d) by removing the fixing screws (E).
3.
With circuit-breaker in the withdrawable version, remove the protection (F) and the terminal-cover (G)
by removing the screws (H)
E
A
D
C
Figure 74 - Four-pole fixed circuit-breaker
4.
Remove the gearmotor (E) by removing the screw (F).
Figure 76 - Removing the gearmotor
5.
If there is a undervoltage coil (M), remove it, and discharge the springs of the operating mechanism for
closing and opening the circuit breaker.
Figure 77 - Removing the undervoltage coil
B
Figure 75 - Three-pole withdrawable circuit-breaker
2
I
3
4
2
M
Putting into service and maintenance | 4 - Maintenance operations
ABB | SACE Emax 2
A
B
C
G
L
4
1
F
H

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emax e1.2-aEmax e1.2

Table of Contents