Prru3901 Cable List - Huawei DBS3900 Installation Manual

Lampsite
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

LampSite
Installation Guide
国际标准
l
l
l
l
l
l
l
Bending radius
l
l
l
Cable binding
l
l
l
l
l
l
Safety
l
l
l
Requirements for Special Cables
Ethernet Cable
l

6.5.2 pRRU3901 Cable List

This section describes pRRU3901 cable connections.
Issue 08 (2015-01-15)
用户建筑综合布 ISO/IEC 11801
商业建筑电信布线标准 EIA/TIA 568
商业建筑电信布线安装标准 EIA/TIA 569
商业建筑通信基础结构管理规范 EIA/TIA 606
商业建筑通信接地要求 EIA/TIA 60
信息系统通用布线标准 EN 50173
信息系统布线安装标准 EN 50174
The bending radius of a 1/4'' jumper, a 1/2'' softer jumper, and a 1/2'' common jumper must
be longer than 35 mm, 50 mm, and 127 mm, respectively.
The bending radius of a power cable is at least three times the diameter of the cable.
The bending radius of a signal cable must be at least five times of the diameter of the cable.
Cables of the same type are bound together.
Different types of cables must be separately routed with a minimum spacing of 30 mm and
cannot be entangled.
The cables are bound tightly and neatly and the sheaths of the cables is intact.
The cable ties face the same direction and all cable ties bound at similar positions must be
in a straight line.
The extra length of each indoor cable tie must be cut off. A slack of 5 mm is reserved for
each outdoor cable tie before the extra length is cut off. All cut surfaces are without sharp
edges.
Labels or nameplates are attached to both ends, joints, or turns of cables after they are
installed.
Cables are placed away from sharp objects or wall burrs. If these positions are inevitable,
protection pipes are required for the cables.
Cables are routed away from heat sources, or heat-insulation materials are added between
cables and heat sources.
A clearance is reserved at turns of a cable or the position close to a device, facilitating cable
and device maintenance. The recommended clearance is about 0.1 m.
A maximum of 100 Ethernet cables can be bundled if no PVC pipes are used. If pipes are
used, a maximum of 24 Ethernet cables can be led through a pipe. In this case, ensure that
1/3 space inside the pipes must be vacant.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Installing a pRRU3901
75

Advertisement

Table of Contents
loading

Table of Contents