6.5 Installing pRRU3901 Cables

This section describes the procedure of installing the pRRU3901 cables.

6.5.1 Requirements for Cable Layout

Cables must be routed according to the specified cabling requirements to prevent signal
interference.
General Requirements for Cable Layout
中国标准
l
l
l
l
l
l
l
Issue 08 (2015-01-15)
NOTE
If certain cables listed below are not required, skip the requirements for routing these cables.
综合布线系统工程设计规范 GB 50311-2007
综合布线工程验收规范(含条文说明) GB 50312-2007
安全防范工程技术规范 GB 50348-2004
电子信息系统机房施工及验收规范 GB 50462-2008
智能建筑工程质量验收规范 GB 50339-2003
建筑电气工程施工质量验收规范 GB 50303-2002
通信管道工程施工及验收技术规范 GB 50374-2006