Toro 74450TE Setup Instructions page 4

With 122cm turbo force side discharge mower
Hide thumbs Also See for 74450TE:
Table of Contents

Advertisement

2. Install the lanyard clips onto the long bolts (1/2 x
3-1/4 inch).
Note: Make sure the bent tab points toward the
head of the bolt.
3. Lightly oil the ends of the center roll bar section.
4. Loosely install the center roll bar section using 2
bolts (1/2 x 3-1/4 inch) and 2 flange nuts (1/2 inch).
Note: Make sure the bolts are installed from the
outside of the roll bar.
Note: Make sure the lanyard tab is installed as show
and points forward.
5. Raise the roll bar into the upright position and secure
it with the pins and hairpin cotter pins fastened to
the lanyards
Figure 7
Figure 8
6. Torque all lower fasteners, attached to the machine
frame, to 30 ft-lb.
7. Tighten the center roll bar bolts (1/2 x 3-1/4 inch)
so it rotates freely with some resistance.
Note: No more than one thread should be exposed
outside the nut.
4
Figure 9
Figure 10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z400 z master

Table of Contents