Figure 5-4 Installation Diagram-Cat. 4909 Cells With 7 Or 20 Foot Leads Connected To 9782; Conductivity/Resistivity Analyzer - Honeywell 4909 CPVC Operation Manual

Conductivity cell removal/insertion assembly
Table of Contents

Advertisement

Temp.
Comp.
Cell
Ce l l A s s e mb l y Co n n e ct i o n s
I
II
III
4905
-
-
333 - X1
I
II
III
4973
4974
-
333 - X1 -
I
II
III
4908
-
-
333 - X1
4909
Ce l l A s s e mb l y Co n n e ct i o n s
I
II
III
4905
-
-
333 - X1
I
II
III
4973
4974
-
333 - X1 -
I
II
III
4908
-
-
333 - X1
4909
Figure 5-4 Installation Diagram-Cat. 4909 Cells with 7 or 20 Foot Leads
7/99
4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual
RED
GREEN
WHITE
BLACK
IV
V VI
IV
V
VII
IV
V
VI
20 ft. max.
Junction Box
IV
V VI
C e l l t o A n a l y z e r T h r o u g h J u n c t i o n B o x
IV
V
IV
V
VI
VII
NOTES:
1. For pure water samples in non-conductive (plastic, glass, etc.) piping, ground the black cell electrode lead near the cell.
Alternatively, connect to the 9782 ground screw as shown dotted. Do not ground 10, 25, or 50 constant cells.
2. 97 8 2C - S 0 (only)
Use 22 gage minimum coaxial cable type RG59/U connecting shield to terminal "SH" only.
3. 9 7 8 2 C - S 0
For cable runs of up to 500 ft., use: 18 gage minimum, three conductor cable.
For cbale runs of 500 - 1000 ft., use: 16 gage minimum, three conductor cable.
9 78 2C - W0 [coax and shield (SH) not used]
For cable runs of up to 500 ft., use: 18 gage minimum, four conductor cable.
For cable runs of 500 - 1000 ft., use: 16 gage minimum, four conductor cable.
4. Cell to analyzer cables are considered low level. Run seperate from high level wiring.
5. If 2 Cells are to be applied, the same guidelines are applied to Cell 2 as wereused for Cell 1.
Connected to 9782 Conductivity/Resistivity Analyzer
Platinization and Platinum Black
Five Point Terminal Board.
Each Terminal Will Accept
#16 Gage Max. Wire
20 ft. max.
Cell cable is approx. 0.250"
(6.4mm) O.D. max. with 4
conductors of #18 AWG
wire, 7 or 20 foot length.
D i r e c t C e l l t o A n a l y z e r I n s t a l l a t i o n
1000 ft. max.
Note 3
R
Red
Green
G
K
Black
W
White
Coax Cable
SH
G
#2 Temp
Compensator
R
G
#1 Temp
Compensator
R
Red
W
Green
Cell 2
Electrodes
Black
K
White
W
Cell 1
Electrodes
K
Note 1
Conductivity/Resistivity
Analyzer
An a l y ze r I np u t C on n e c ti o n s
SH
G
#2 Temp
Compensator
R
G
#1 Temp
Compensator
R
W
Cell 2
Electrodes
Note 2
K
W
Cell 1
Shield
Electrodes
K
Note 3
Note 1
Conductivity/Resistivity
Analyzer
An a l y ze r I np u t C on n e c ti o n s
(Note 5)
(Note 5)
GND
(Note 5)
(Note 5)
GND
a/n 23346
23

Advertisement

Table of Contents
loading

Table of Contents