Site Acceptance Procedure

The purpose of the following procedures is to verify that all installation requirements were noted and checked.
Following this procedure will ensure proper, long-lasting, and safe operation of the product.
The checklist below summarizes the installation requirements of the site.
1. SITE INFORMATION
Customer:
Radio model:
Site name:
Site code:
Radio link code:
Site address:
2. ANTENNA MOUNTING
Antenna mount type:
Mount is of sufficient height to clear local obstructions
Mount is safely positioned to not cause a safety hazard
Mount is secure and perpendicular
Mount is grounded as per site specifications
All steelwork is Galvanized or Stainless Steel as appropriate
3. ANTENNA
Antenna type (model and size):
Antenna is securely fixed to mount
Antenna is grounded as per site specifications
Antenna sway braces are installed correctly (where
applicable)
Antenna Radome is securely fitted (where applicable)
Water drain plugs are fitted and removed, as appropriate
Antenna sealing O-Ring is properly fitted and not damaged
Antenna/Launch unit polarization is as per link requirements
3-2
SITE ACCEPTANCE CHECKLIST
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
MDS Intrepid-HC HP Installation and Operation