Installation Components
Installation Procedure
1.
Connect both pole mount kits to the pole.
If the RFUs are to be assembled one above the other, there should be a minimum distance of 40 cm between
the two pole mount kits, as shown in the following illustration.
GE MDS Intrepid-HC HP Installation Guide
M10 Screws
Fastening
Hanging
Bracket
the OCB to
the Hanging
Bracket
Pole Mount
Diversity
Kit with Clamp
Coupler
Bracket
40 cm
Lifting
Handle
Main
Coupler
1-13